According to different principles, the deodorizer is designed to be spray type (A type) and air supply type (non spray type) (B type) to meet different user needs. Both are wall mounted and can be placed upright. The box body is made of all stainless steel material and has undergone special surface treatment, ensuring both aesthetic appearance and meeting the requirements of equipment corrosion prevention. Adopting digital timing controller automatic loop control and timing segmented control mode, the working time and stop time can be set arbitrarily. After setting, it can work continuously without personnel duty. When the equipment is stopped, the red button for turning off the power can be used. Type A adopts atomization components inside and is equipped with a water shortage protection device. The generated fog particles are uniform and suspended in the air for a long time. Type B is a drip infiltration mode, without atomization components and spray phenomenon. The deodorant liquid molecules and air penetrate and absorb, neutralize odor molecules, with remarkable results.
Features of this product: No need to connect pipes or water tanks during liquid inlet and normal operation, it can be hung and used immediately, and installation and maintenance are fast and convenient!
The deodorizer operates without mechanical drive, noise interference, pollution, high efficiency, low failure rate, and low energy consumption. It is an efficient, reliable, and practical deodorizing device; Paired with appropriate deodorizing liquid or disinfectant, it is used for various indoor air treatment tasks such as deodorizing, sterilizing, disinfecting, humidifying, and refreshing the air, increasing the negative ion content in the air. It is not only suitable for public toilets, but also for adding different plant liquids and adjusting different dilutions. It is more suitable for air freshness and fragrance in public places, such as subway stations, garbage transfer stations, airport waiting halls, station halls, hotel lobbies, shopping mall public areas, office areas and other densely populated public places for odor removal, sterilization, disinfection, fresh air and other operations. Adding different mixed solutions can also be used in workplaces such as aquaculture, planting, dust removal, and electrostatic elimination. Users can adjust the properties and concentration of the added solution according to different application methods to meet the corresponding environmental or work requirements
Voltage |
220V/50Hz |
Power |
25-36W |
Mist output |
≤400ml/h |
Noise |
≤30dB |
Size |
350mmx120mmx420mm |
Applicable area |
35/50m |
The principle and function of the operation mode of the deodorizer
The deodorizer atomizes a mixture containing a certain ratio, and the resulting mist is evenly dispersed in the air by the wind turbine. When the mist comes into contact with the surrounding air, it can quickly undergo polymerization, displacement, adsorption, and other reactions with various harmful and odorous molecules, causing changes in the structure of the original pollutant gas odor molecules, making them non-toxic, harmless, and odorless molecules, in order to achieve the following effects:
Installation of deodorizer
Open the packaging of the deodorizer, remove the wall mounting plate behind the device, select the installation position of the device, pay attention to choosing a hard wall or a wall that has been safely treated, use a hanging line or a level ruler to find the level, and fix the wall mounting plate fixing parts with screws at the installation location. Please use matching expansion screws for the screw specifications. If there is an insulation layer on the wall, the screw length should be increased. Fix the equipment installation board horizontally in the installation position, hang the upper end of the machine on the upper end of the installation board, and fix it to the installation board with two screws. This completes the fixed installation. Next, connect the power cord to the power socket, open the side storage compartment, take out the liquid inlet tube to extract the mixed solution (see the liquid addition process on the following page), add about 6 liters (kilograms) of mixed solution to the built-in water tank, then turn on the power switch, set the timing controller, and press the start button to start timing work.
After installation, pull the wall mounted panel fasteners by hand to confirm their firmness. The fasteners should be able to withstand 50 kilograms after installation and the force on each fixing screw should be relatively uniform. Install the deodorizer smoothly onto the wall mounted panel and adjust it left and right to ensure it is fully inserted
Specific dimensions: length x width x height=350 x 120 x 420 (mm)
Control panel operation
1 Loop delay on-off control mode (common type)
Cut offOpening time and connection time
When the controller sets the disconnection and connection time, it will continue to work on disconnection after connecting the working power supply-----put through-------break-------put through---------The working status and the time for disconnection and connection are set as the disconnection and connection time.
Setting method:
Serial Number |
Magnification |
meaning |
Delay Time |
1 |
S |
1second |
1s--99s |
2 |
M |
1minute |
1m—99m |
3 |
H |
1hour |
1h—99h |
Example of setting time: If disconnection is required5Minutes, connect3Minutes, working repeatedly, we can choose to set the disconnection time as“0”“3”“M”The connection time is set to“0”“5”“M”When the power is turned on, it will work according to the predetermined mode.
Mixing ratio description and liquid addition process diagram
Fluid replacement operation method:
1 The capacity of the mixing bucket is 6 liters, and the ratio of the mixed liquid to tap water is 1:100 for mixing;
2 When the fluid replenishment button indicator light is on, it indicates that the water tank is short of mixed fluidOpen the storage compartment on the side of the device, take out the inlet pipe and place it at the bottom of the proportioning bucket. Press the side inlet switch, start the inlet pump, and extractPre preparedMixing liquid in the proportioning bucketUntil the fluid replenishment light goes out and the pumping pump stops working;
3 Press the fluid replenishment button again to place it in the initial pop-up state, retract the suction hose, and close the side door of the chassis,End the liquid inlet;
4 The control panel is generally set to cycle back and forth between 5 minutes of startup and 5 minutes of shutdown, with a full box mixed
The usage cycle of the composite solution is about 7-10 days