Shenzhen Chaojinda Ultrasonic Engineering Equipment Co., Ltd
Home>Products>Fully automatic gantry electroplating production line
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    180-3806-4705
  • Address
    No. 218, Henan New Village, Songyuanxia Community, Guanhu Street, Longhua District, Shenzhen City, Guangdong Province, China. Chaojinda Industrial Park
Contact Now
Fully automatic gantry electroplating production line
Fully automatic gantry electroplating production line
Product details

Equipment features
The production line is composed of automatic control methods, designed according to the buyer's process production requirements, combined with practical operating standards and the rich experience of Shenzhen Chaojinda Ultrasonic Engineering Equipment Co., Ltd. in surface treatment equipment manufacturing. It is a gantry style production line.
The production line is equipped with a medium rail gantry crane (depending on the number of cranes equipped in the process), which is controlled by PLC for horizontal and vertical operation. Mitsubishi frequency converters are used to achieve multi-level automatic speed regulation, slow start, stop, and fast operation. The horizontal operation speed is 4-40m/min, and the lifting speed of the hook is 7-12m/min; The overall operation and control of the machine are centralized in the main electrical control cabinet, with each temperature control instrument, operation switch, voltmeter, etc. installed separately for the corresponding crane, facilitating operation and control. A separate touch screen is used for separate monitoring, and an open program monitors the corresponding crane's actions in real time and automatically timing the workpiece after it is placed in the groove. The process parameters can be set. Ensuring product quality, improving product consistency, and facilitating standardized management in the workshop. There are two operation modes to choose from: automatic and manual control, and they can be switched between any workstation.
The production pace of the entire line is adjusted based on the maximum running speed of the train and the actual process of the production line.
The loading and unloading process of the entire line is completed by an automatic mechanism combined with manual operation, and the loading position is fixed and confirmed manually. The crane with automatic control for driving is lifted into the surface treatment function slot to complete the electroplating work program.

Equipment usage
Used for electroplating surface treatment of hardware parts

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!