Shandong Taixiang Environmental Protection Engineering Co., Ltd
Home>Products>Integrated equipment for decolorization of printing and dyeing wastewater
Integrated equipment for decolorization of printing and dyeing wastewater
Integrated equipment for decolorization of printing and dyeing wastewater
Product details
1、 Purpose:
Suitable for residential communities, hospitals, nursing homes, office buildings, shopping malls, hotels, restaurants, government offices, schools, military units, aquatic processing plants, livestock storage processing plants, dairy processing plants, and similar industrial organic wastewater treatment, such as textile, beer, paper, leather, food, chemical and other industries. The main purpose is to treat domestic wastewater and similar industrial organic wastewater to meet the requirements of recycled water quality, and to make the treated wastewater resource efficient.

2、 Model specifications:
The buried domestic sewage treatment equipment produced by our company includes two series: WSZ-A modular and WSZ-F fiberglass reinforced plastic, with a treatment capacity of 0.5-50m3/H, totaling more than 30 specifications.

3、 Main features:
1. Can be buried underground
2. Fully automatic control, no personnel management required
3. No sludge reflux
4. Easy to operate and maintain
5. Low noise, no odor
6. Long service life

4、 Process description:
The design of WSZ-A equipment is mainly aimed at the treatment of domestic sewage and similar industrial organic sewage. The main treatment method is to use the currently mature biochemical treatment technology - contact oxidation method. The water quality parameters are designed according to the general domestic water quality, with inlet BOD of 20Omg/l and outlet BOD of 20mg/l. It consists of six parts: (1) primary sedimentation tank; (2) Contact oxidation tank; (3) Secondary sedimentation tank; (4) Disinfection pool and disinfection device; (5) Sludge tank; (6) Fan room, fans;
The following are discussed separately:
(1) Primary sedimentation tank: The equipment's primary sedimentation tank is a vertical flow sedimentation tank, and the upward flow velocity of sewage in the sedimentation tank is 0.6-0.7 millimeters per second. The settled sludge is lifted into the sludge tank by air. (Note: WSZ-A O.5-5m3/h does not have a primary sedimentation tank)
(2) Contact oxidation tank: After initial sedimentation, the water flows automatically to the contact tank for biochemical treatment. The contact tank is divided into three stages with a total residence time of more than 1 hour. The contact oxidation time of the reinforced equipment can reach 6 hours, and the filler is a novel trapezoidal filler. Easy to form conjunctiva and not clog. The specific surface area of the filler is 160m2/m3, and the gas water ratio of the contact tank is around 12:1. (WSZ-A 0.5-5T/h, contact cell is secondary)
(3) Secondary sedimentation tank: Biochemical wastewater flows into the secondary sedimentation tank, which consists of two vertical flow sedimentation tanks operating in parallel. The upward flow velocity is 0.3-0.4 millimeters per second. The sludge is discharged by air lifting to the sludge tank. (Note WSZ-A0.5-5mT/h, sludge flows automatically into the sludge tank)
(4) Disinfection pool and disinfection device: The disinfection pool is designed according to the specifications: "TJI4-74" standard is 30 minutes. If it is hospital sewage, the disinfection pool can increase the residence time by 1-1.5 hours. The disinfection method uses solid chlorine contact dissolution. The disinfection device can continuously change the dosage according to the size of the water output, achieving the goal of adding more water and more medicine, and adding less water and less medicine. Other disinfection devices can be prepared separately. (Note: If used for industrial wastewater disinfection tanks and disinfection devices, it is not necessary)
(5) Sludge tank: All sludge from the primary and secondary sedimentation tanks is carried by air into the WSZ-A sludge tank for aerobic digestion. The clear liquid from the sludge tank flows back to the contact oxidation tank for further treatment. After digestion, there is very little residual sludge, usually cleaned once every 1-2 years. The cleaning method can be to use a suction truck to extend from the inspection hole of the sludge tank into the bottom of the sludge and carry out suction and transportation. (WSZ-A 0.5-5T/h, sludge is digested anaerobically)
(6) Fan room and fan: The fan room of equipment WSZ-A is located above the disinfection pool, and the inlet adopts double-layer sound insulation. The inlet has a muffler and fan filter, so there is no noise during operation. The fan adopts two L-shaped Roots blowers, which can automatically alternate operation. The operating life of a single wind turbine is about 30000 hours.
Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!