Jilin Taihe Testing Machine Co., Ltd
Home>Products>Rocker switch test bench
Product Groups
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13944903695
  • Address
    1599-1 Kaiyun Street, Chaoyang District, Changchun City, Jilin Province
Contact Now
Rocker switch test bench
The rocker switch test bench is mainly composed of four parts: rocker test bench, force side torsion test bench, resistive load box, and control cabin
Product details

Rocker switch test bench

This device is a specialized equipment for durability testing of automotive rocker switches, capable of
Complete various automotive rocker switches under various environmental conditions (room temperature, -40 ℃, 90 ℃)
Durability test and force torsion test on car switches at room temperature, test method
The main criteria are:
QC/T 632-2000 "Technical Conditions for Bent Switches for Automobiles"
JB 3126-82 "General Technical Conditions for Automotive Switches"
QC/T 218-1996 Technical Conditions for Combination Switches on Automotive Steering Columns
QC/T 198-1995 General Technical Conditions for Automotive Switches
Rocker switch test bench
2、 Testing items
1) Contact voltage drop detection of rocker switch;
2) Conduct on/off and load performance tests on the contacts of each gear of the rocker switch;
3) Mechanical life test of rocker switch;
4) The torque and magnitude of the twisting force, shifting force, and lifting action of the combination switch
5) Twisting torque of rocker switch, pressing force, pulling force
6) The turning torque and insertion force of the ignition lock key.
2、 Test bench structure and composition
1. The test bench consists of a rocker test bench, a force side torsion test bench, a computer control cabinet, and an electrical
The source load box consists of four parts. The mechanical platform adopts an aluminum alloy profile frame structure
Structure.
2. The anti-corrosion treatment and appearance color of the test bench should comply with relevant standards and industrial design requirements
Request; The surface of the rocker mechanical operating table is made of aluminum alloy and treated with anti-corrosion to prevent corrosion
Corrosion occurs under high and low temperature conditions.

IIIdetailed description
1. Mechanical operation console section
The external dimensions of the test bench are approximately 700mm * 600mm * 500mm (length)
700mm; the connector is an L-shaped aviation connector; Width of 600mm, motor swing in the middle
Three switches can be installed simultaneously in the front and back for testing; The base is designed as a roller
The test bench has three testing stations, each of which is independent and easy to move
Control. The first two and last two components of the assembly switch are tested twice to complete the action
The experimental action is completed at that time, and the button switch is implemented using a high and low temperature cylinder (SMC),
In order to ensure the stability and reliability of the gas source during the experiment, the purchaser shall provide their own drying equipment for the gas source
Be prepared. Using Panasonic servo motor drive, it can achieve the rise and fall of different types of switches
The function of lowering and other actions can also be achieved on the panel by replacing specialized fixtures
The action functions of other button switches, the action speed and angle of the front and rear door switches
The degree can be set in the program, and aluminum profiles can be used instead of T-shaped slots.
The design of experimental equipment requires universality, and for the same functional type
Close, it is required that the equipment can be used for testing under the replacement of fixtures. For switches with the same properties
It is required to adapt to the test under flexible control and load replacement.


To ensure the accuracy of the switch action, a proximity switch is installed in the system as the mechanical origin. At the beginning of each test cycle, the system automatically returns to the origin to ensure no cumulative error.

2. Thermal insulation mechanism
Upper driving part of the test bench and lower part of the bench body
Special insulation materials are used for protection. In insurance
The temperature sensor is installed inside the temperature mechanism
The insulation system has malfunctioned, causing an internal temperature loop
When the environment exceeds the normal range, the system will automatically sound and light an alarm to remind the operator to go and handle it.
3. Fixture section


At the time of leaving the factory, Party B shall open based on the sample
Provide two sets of universal installation clips for different types of products
At the same time, provide each type of opening for Party A
Customize a set of specialized fixtures for each party. clamp
Can slide freely in the T-shaped groove of aluminum profiles
By moving and replacing the corresponding fixtures, the system can conduct tests on switches such as buttons.
4、 Test power supply and load box
Output voltage of three load power supplies: 0-60V;
Maximum current: 100A. (Considering that the load is not working simultaneously,
Change 140A to 100A to reduce costs
Test load current:
One workstation: 0.1-10A (4 channels), 0.1-100A (1)
The load consists of 5 circuits, with a total current of 140A;
Two workstations: 0.1-10A (4 channels), 0.1-100A (1 channel), with a total of 5 loads,
The current is 140A in total;
Three workstations: 0.1-10A (4 channels), 0.1-100A (1 channel), with a total of 5 loads,
The current is 140A in total;
Control mode: Voltage and current are adjusted manually using a knob.
5、 Technical indicators of the test bench
1. Mechanical performance
◇ Switching action frequency: 1-20 times/minute, by adjusting the action speed and pause
Time acquisition, actual use of action frequency, subject to specific parameter settings;
Stay time: 10ms~9999mS;
◇ Action speed: rotation 5-10 °/S, straight line 10mm/S, rotation action speed
By adjusting the program
The action includes: rotation angle+180 degrees, linear travel 80mm;
2. Electrical performance
Contact voltage drop detection interface: 3 × 5 channels, a total of 15 channels;
Contact voltage drop detection accuracy: ± 4mV, range: 1~1999mV, can be set
Set the failure voltage drop of each detection contact within the range of 1~1999mV;
Each power supply has a voltmeter that displays the operating voltage with a resolution of 0.1V;
Durability test frequency range: 1~999999 times;
During the testing process, the temperature sensor is used to monitor the testing temperature;
6、 Usage conditions
◇ Altitude: 0-1000m;
◇ Humidity range: 35-98% (relative humidity);
◇ Operating temperature range: -40 to+85 ℃;
Power supply voltage: AC 380V ± 10%/50Hz, grounding wire;
◇ Working system: unmanned working system;
7、 Product acceptance
1. Pre acceptance on site by Party B
After the equipment manufacturing is completed, notify Party A to come to Party B's production site for pre acceptance
Pre acceptance includes whether the product configuration and functionality provided by Party B are consistent with the technical specifications
The requirements are consistent. If it does not match, Party A shall propose modifications, and Party B shall make improvements. the first of the ten Heavenly Stems
Party B can only ship after passing the pre acceptance inspection.
2. Final acceptance of Party A's work site
The equipment shall be delivered to Party A, and both parties shall jointly unpack and count the delivery configuration.
The second party is responsible for hardware and software installation, as well as system debugging. After installation and debugging are completed
After completion (Party A sends personnel to cooperate with Party B for installation), according to the technical specifications
Book acceptance.
During the final acceptance, Party B shall provide the product's electrical schematic diagram, user manual, and software
Backup files (two sets in total). And related technical documents and clamps such as equipment qualification certificates
Provide drawings.
After the second party delivers the equipment and provides training, the first party signs on the acceptance form for final inspection
Received.
8、 Equipment information
1. Two sets of Chinese instruction manuals for the equipment
2. 2 sets of program backup CDs
3. 1 copy of circuit schematic and gas circuit schematic
4. 1 list of vulnerable parts
5. 1 copy of equipment installation list
6. 1 certificate of conformity

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!