Shanghai Hanerde Automation Technology Co., Ltd
Home>Products>Sheet metal automation material warehouse
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    13917964331
  • Address
    No. 149, Lane 150, Pingbei Road, Minhang District, Shanghai
Contact Now
Sheet metal automation material warehouse
We can customize a material warehouse according to customer requirements, equipped with loading and unloading robotic arms and control software, to ac
Product details


We can customize a material warehouse according to customer requirements, equipped with loading and unloading robotic arms and control software, to achieve the storage, retrieval, cutting, and unloading of sheet materials.

2. targets

The sheet metal automation warehousing system provided by Shanghai Hanerde Automation Equipment Co., Ltd. is designed with the principle of meeting customer needs for the system, in order to determine the goals of system construction.

2.1System indicator requirements

project

index

Compared to before construction

Site occupation area

18 m2

Height of three-dimensional warehouse

5.4m

Improved compared to before6 times

Number of storage trays

12 support from under

Improved compared to before12Doubling, the utilization rate of the venue has increased compared to before12times

Storage weight

2T/tray

Efficiency of inbound and outbound inventory

60support from under/Hour (maximum, simultaneous operation of inbound and outbound)

Under the same forklift, the lift is higher than before4Multiple, adjustable, low actual usage rate, only for storage use

Operation method for inbound and outbound inventory

Automated storage

Compared with traditional storage methods, it is orderly, accurate, time-saving and labor-saving

operator

0 people

Save more than before2-3People (forklift drivers)1Personnel and warehouse managers1-2Excluding cutting equipment and processing operators

system safety

Automatic equipment automatically performs security precautions and automatic alarms

Traditional manual operation relies on employee safety education

Mean time between failures

Not less than1000hour


Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!