English

Wuhan Tailulai Environmental System Co., Ltd
Home>Products>TFB-05 tilting metal wind vane
TFB-05 tilting metal wind vane
Introduction to TFB-05 tilting metal wind vane Wind vane Wind vane is used to indicate wind direction and provide wind speed reference
Product details
TFB-05可倾倒式金属风向标

Introduction to TFB-05 tilting metal wind vane

Wind vane is used to indicate wind direction and provide wind speed reference. The tilting metal wind vane consists of six parts: wind vane, wind wheel, tail wing, moving rod, main rod, and base. The main rod is made of galvanized pipe, and the fan blades are made of high-quality engineering plastic with strong corrosion resistance. The moving rod part is made of high-quality double stainless steel waterproof bearings with high sensitivity, low starting wind speed, and durability; The product has the characteristics of easy installation and convenient transportation, and is widely used in industries such as meteorology, chemical industry, mining area, agriculture, and oilfield exploration.

  Tiltable metal wind vaneTFB-05, Equipped with a base and a main pole, the main pole is made of galvanized pipe, consisting of two sections with a lower diameter of 76cm and a length of 3m, and an upper diameter of 60cm and a length of 2m.

Characteristics:

1. Can be directly installed on cement floors or metal platforms

2. Single person operation can erect or fold, install and maintain for convenience

Parameters:

Wind elevation: 5.4m

Wind turbine diameter: 0.65m

Directional marker length: 0.86m

Weight: 40kg

  Fluorescent tilting metal wind vaneTFB-05Y, The mechanical structure is exactly the same as the metal wind vane, with a circle of fluorescent material around the wind vane that absorbs solar energy during the day and emits light at night.

Characteristics:

1. Can be directly installed on cement floors or metal platforms

2. Single person operation can erect or fold, install and maintain for convenience

3. Convenient for nighttime observation

2.JPG

Packing list number, component name, quantity, unit, note 1. Loose leaf base, 1 set, 2 main poles, 2 sections, 3 movable poles, 1 set, 4. Tail wing/benchmark, 1 set, 5 impellers, 1 blade, 6 instruction manuals, 1 certificate of conformity

8 anchor bolts and 4 fixed bases

Installation guide: Installation location selection: This product is suitable for installation on the ground, and the surrounding area should be relatively open, making it easy for ground personnel to observe.

Installation: Fix the base with 16 × 300 anchor bolts on the cement floor; Fix the base of the iron tower with screws at the plane; Open the loose leaf base and install two main poles, moving poles, tail fins/benchmarks, impellers, etc. on the ground in sequence; After installation, push up the main pole and lock the loose leaf base with screws to complete the installation.

Attention: The main pole should be installed perpendicular to the ground. If the installation site has a steep slope, a cement platform of not less than 60 × 60 should be cast first for installation. If there is only a small angle of tilting, a washer can be added to the lower part of the base for adjustment.

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!