Host introduction: This system mainly detects the insulation testing of single and three-phase asynchronous motors and AC permanent magnet motors for
Product details
Thirteen station insulation testing system
|
Requirement analysis
|
|||
|
1、 Customer Products
|
Single and three-phase asynchronous motors, AC permanent magnet motors for finished deep well pumps
|
||
|
2、 Customer demand
|
Thirteen station insulation testing system
|
1. Test item: Insulation
|
|
|
2. Thirteen workstations
|
|||
|
3. The motor has four lead wires, red, black, yellow, and green. The green wire is connected to the housing, and the red, black, and yellow wires are connected to the stator. During testing, the red, black, and yellow wires are twisted together, which means that one motor outputs only two wires. There are a total of thirteen motors, which means that they output 26 wires
|
|||
|
4. Testing process: In a sealed container, let all thirteen motors be submerged in water at a high voltage of 2.5MPa. After soaking for 2 minutes, test the insulation in sequence. If the insulation resistance value is greater than 200M Ω, it is judged as qualified, and if it is lower than 200M Ω, it is judged as unqualified. After soaking for 2 minutes, test the contract at each workstation in sequence and judge it as PASS. If it is judged as unqualified, it is judged as FAIL. The qualified display is green, and the unqualified display is red
|
|||
|
5. After the completion of the customer control part (i.e. soaking for 2 minutes), output a signal to us and we will start testing. After all thirteen workstations are completed, output a signal to the customer so that they can proceed to the next action
|
|||
|
|
|||
|
3、 Customer product parameters
|
Motor stator power 0.37KW-11KW
|
||
|
4、 Electrical
|
|
||
|
5、 Mechanical
|
|
||
|
6、 Software functional testing
|
Safety testing
|
isolation
|
|
Thirteen station insulation testing system scheme
1、 Buying and selling targets:
|
Serial Number
|
physical property
|
subsystem
|
Equipment name
|
technical requirement
|
Specification and model
|
Number
|
|
1
|
Electrical hardware
|
Cabinet 1
|
Vertical cabinet
|
Built in all-in-one machine, contactor, electrical switch, wiring, etc
|
VG-14X-ATE
|
1 set
|
|
360 degree rotatable cantilever
|
||||||
|
2
|
2 measurement units
|
1PLC control module
|
Thirteen workstation output
|
|
1 set
|
|
|
3
|
2 Insulation testing module
|
Test voltage: DC500V/1000V
|
AN9671XW
|
1 unit
|
||
|
2. Insulation resistance test: 0-500M Ω
|
||||||
|
3 Accuracy: 3% (<200 M Ω)
8%( ≥200 MΩ)
|
||||||
|
4
|
3 High Voltage Relay Modules
|
10KV High Voltage Relay
|
|
1 set
|
||
|
5
|
3 Information supporting units
|
Integrated machine
|
2G memory, 320GB hard drive, 17 'screen, 6 serial ports
|
PPC-YQ170T
|
1 unit
|
|
|
6
|
||||||
|
7
|
Upper computer software
|
Upper computer software
|
insulation resistance
|
Check whether the winding has serious leakage or short circuit to the shell; Apply a certain amount of DC high voltage between the coil winding and the casing for a certain period of time
|
|
1 set
|
|
Thirteen workstations display qualified or unqualified
|
||||||
|
8
|
Freight and on-site debugging
|
|
|
Once
|
||
|
9
|
Ten workstations increased to thirteen workstations
|
|
|
1 set
|
||